Don't change how you estimate. Just make it faster. Schedule a demo →
1,200+ contractors use this every monthFree foreverNo account

Demolition Permit Cost Calculator

Estimate demolition permit fees by structure square footage. National baseline adjusted for your region.

Find scope gaps before they become your problem.

Every gap a sub leaves out lands on you. BidFlow flags uncovered scope in your estimate so you can budget it before you bid.

Estimate Summary

Best estimate--
Range (low – high)--
Confidence--

National average will be used until you enter a ZIP. Permit fee only - verify with your local permit office.

What this calculator does

Estimates the permit fee only - for total demolition cost (debris hauling, labor, equipment, hazardous abatement, contingency), use the Demolition Cost Estimator. National baseline: $100 base + $0.20/sf, $75 minimum. Adjusts regionally via the BidFlow City Cost Index.

What's NOT included

  • Demolition labor and equipment
  • Debris hauling and disposal fees
  • Asbestos / lead / hazardous-material abatement (often required separately)
  • Utility disconnect fees
  • Site restoration and grading

Need the full demolition picture?

The Demolition Cost Estimator covers all of the above for a complete project budget.

By BidFlow Editorial